Quick answer
For your first Cost factors task, do not change many settings: run defaults once, then adjust one item at a time. Area/location/material/containment/HVAC/rebuild drive total.
Why it matters
Change one variable at a time so you know which setting matters.
Area.
Step by step
- Find/fix moisture and measure humidity before remediation.
- Separate testing/containment/remediation/air/rebuild.
- Get 2-3 quotes; confirm scope/clearance.
- Insurance depends on cause/exclusions/limits.
Common mistakes
- Remediating without fixing moisture.
- Comparing totals without scope/clearance.
- Ignoring HVAC/walls/crawlspace.
- Not checking insurance exclusions.
Checklist
- Moisture/humidity/area/location.
- Testing/containment/remediation/air.
- HVAC/walls/crawlspace/attic.
- Clearance/insurance/warranty.
- Rebuild/budget/prevention.
Key facts
- Area.
- Location.
- Rebuild.
FAQ
How do I start with Cost factors?
For your first Cost factors task, do not change many settings: run defaults once, then adjust one item at a time. Area/location/material/containment/HVAC/rebuild drive total.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: IICRC